Incoterms 2010 scheme

Each term of Incoterms 2010 is an acronym of three letters.

Here is a complete list of Incoterms 2010 terms and the necessary comments to them.

Click on the image to enlarge.

in3in3

Manufacturer’s works

Carrier

Alongside Ship

On board

Border

Arrival

Port

Terminal

Buyer

Main transport modes

EXW

Ex Works

costs and risks of loading and transportation of the goods

E+I

 

FCA

Free carrier

E

The seller bears all the costs and risks of loading

shipping risks and costs, if delivery occurs not at the seller's premises

I

 

FAS

Free Alongside Ship

E

risks and costs

risks and costs

I

 

FOB

Free on Board

E

risks and costs

risks and costs

I

 

CFR

Cost and Freight

E

risks and costs

risks and costs (freight excluded)

I

 

freight

CIF

Cost, Insurance and Freight

E

risks and costs

risks and costs (freight excluded)

I

 

freight plus insurance costs

CPT

Carriage Paid To

E

risks and costs

risks and costs (after the goods are transferred to the carrier)

I

 

transport costs (including unloading costs, if included in a contract of carriage)

CIP

Carriage and Insurance Paid to

E

risks and costs

risks and costs (after the goods are transferred to the carrier)

I

 

transport costs (including unloading costs, if included in a contract of carriage) plus insurance costs

DAT

Delivered at Terminal

E

risks and costs

risks and costs

I

 

DAP

Delivered at Place

E

risks and costs (unloading excluded)

risks and costs

I

 

DDP

Delivered Duty Paid

E+I

risks and costs (unloading excluded)

 

E-export customs clearance

I-import customs clearance

Seller